General Notes
Pine Street will be plowed when the snow reaches 1" deep.
Other streets will be plowed when the snow reaches 2-3" deep (see priority list below).
All intersections in Town shall be sanded on the braking or deceleration side after each storm or when the intersections are slick. Sanding will be prioritized: Pine and the intersections onto Pine will have priority; after the heavily traveled streets have been sanded and plowed, all other intersections in Town will be sanded.
The snow pile in the center of Pine Street shall be removed when it reaches a height of approximately 2 1/2 feet.
All overtime must be approved by the mayor.
Removed snow will be transported to an approved disposal area.
Disposal Area List
Old Town Shop lot, old Town Hall, right-of-way on Mill St, right-of-way on South Bridge Ave, parking lot on North Madison Ave, and South Jackson Park.
Snowplowing Priority List
Pine St. Fremont Lake Rd to the medical clinic, clear intersections in berm on Pine St.
Hennick, Tyler, Fremont, Bridger, Lincoln, Madison, Jackson, Entertainment, Country Club, and Bloomfield (the first roundabout on Bloomfield to allow traffic to turn around).
All four quadrants northeast, southeast, northwest, southwest.
Plow sidewalks next to Town properties, old town hall, town parks and pathways, all town facilities.
Alleyways and Town parking areas.
Scrape ice and remove berm from Pine St. when it reaches 2 1/2 ft.
Clean out snow around fire hydrants.
Remove snow piles that are obstructing visibility and snow storage.
Smooth rough roadways with the grader as necessary.
Scrape slush as necessary.